A garment manufacturer needs to order a custom cotton fabric to make summer dresses. What is the lead-time for fabric delivery that the manufacturer should factor into the production schedule?

Answer :

myteanna31

2-3 business days that away the manufacturer can get their products in a timely manner and their products can be out and shipped in a timely manner also.

Answer:

5 days