Answer :
Answer:
a) 154054 gals
b) 20850 lb/day
c) 0.7392hr
d) 2.466day^-1
e) 7.23 lb/day-1000 ft^3
Explanation:
a)
[tex]Vx = \frac{Qy(So - Se)}{1+kdQc}= \frac{5x10^{6}(0.6)(200-10)}{1+0.06(8)}=154054 gals[/tex]
b)
Dry mass = 5 MGD * (0.20) * (2500 mg/l) * 8.34 = 20850 lb/day
c)
Aeration period Q = [tex]\frac{V}{Q} =\frac{154054}{5x10^{6} } =0.0308day=0.7392hr[/tex]
d)
[tex]\frac{F}{M} =\frac{Q(So-Se)}{Vx}=\frac{5x10^{6}(200-10) }{154054(2500)}=2.466day^{-1}[/tex]
e)
BOD loading = [tex]\frac{8.34(5)(200)}{154.054(7.48)} = 7.23 lb/day-1000 ft^{3}[/tex]