total factory ovehead for a single unit of ding adding both, fabrication and asembly department:
$47.63
Missing information:
Product # DLH MH
Rings 1,080 7 7
Dings 2,280 7 8
Explanation:
fabrication applies overhead based on machine hours:
85,700 expected overhead
1,080 units if Rings x 7 MH +
2,280 units of Dings x MH = 25800
85,700 / 25,800 = 3,3217
Assembly applies overhead based on labor hours:
expected overhead 70,900
1,080 x 7 DLH +
2,280 x 7 DLH = 23,520
70,900 / 23,520 = 3,0144557
Overhead applied for a single unit of DING:
7 x 3.01 assembly overhead +
8 x 3.32 fabrication overhead
total for 47.63