Answer :
Answer:
This problem requires us to pass journal entry to assign overhead to the Assembly and Finishing Departments.
We know that overhead is allocated on estimation basis through applied overhead account. The basis of assignment is given in the question. The overhead will be assigne/recorded in relevant department work in process cost account. The journal entry is given below.
Debit Assembly WIP Account $ 70,720
(44,200*1.6 = 70.720)
Debit Finishing WIP Account $ 28,000
((62,200-44,200)*1.6 = 28,800)
Credit Factory Overhead applied Account $ 99,520