Suppose that you are trying to choose which of two IT projects to accept. Your company employs three primary selection criteria for evaluating all IT projects: (1) proven technology, (2) ease of transition, and (3) projected cost savings.One option, Project Demeter, is evaluated as:Technology highEase of transition lowProjected cost savings highThe second option, Project Cairo, is evaluated as:Technology mediumEase of transition highProjected cost savings highConstruct a table identifying the projects, their evaluative criteria, and ratings. Based on your analysis, which project would you argue in favor of adopting? Why?

Answer :

asarwar

Answer:

The explanation of this question is given below in the explanation section.

Explanation:

 In this question, it is asked about to select one project among two given project based on the evaluation criteria. These evaluation criteria include:

  1. Proven technology
  2. Ease of transition
  3. Projected cost saving  

  Based on my analysis, I will select the project cairso because It has high transition and high projected cost saving.

The analysis of these project is shown in attached picture with this solution.

               

${teks-lihat-gambar} asarwar