Answered

the production line where you work can assemble 5 amplifiers every 30 minutes at this rate how long should it take the line to assemble 125 amplifiers

Answer :

See this question as Ratio.

Amplifiers  :   Time Taken in minutes
    
      5          :          30
   
     5x= 125
       x= 25

       so

5*25 : 30*25

125 : 750


750 minutes.
 12 hours 30 minutes.

The time taken to assemble 125 amplifiers is required.

Time taken to assemble 125 amplifiers is 750 minutes or 12 hours and 30 minutes.

Time taken to assemble 5 amplifiers is 30 minutes

[tex]5\ \text{amplifiers}=30\ \text{minutes}[/tex]

So,

[tex]1\ \text{amplifier}=\dfrac{30}{5}=6\ \text{minutes}[/tex]

[tex]125\ \text{amplifiers}=125\times 6=750\ \text{minutes}=\dfrac{750}{60}=12.5\ \text{hours}[/tex]

So, time taken to assemble 125 amplifiers is 750 minutes or 12 hours and 30 minutes.

Learn more:

https://brainly.com/question/10442853

https://brainly.com/question/3028294

Other Questions