Andy23261 Andy23261 Today at 5:04 PM Engineering Answered Once the deactivation process occurs, the projected separation I the personnel data system (PDS) flows from base to Headquarters Air Force (HAF); the HAF records status changes from 10 toa. 17b. 18c. 19d. 20